New 22m Bridge for Otorohanga Farm


A new 22m Steel Beam, Concrete Deck farm bridge has been installed just out of Otorohanga (Hangatiki).

Replacing an old steel beam, timber deck structure, the new bridge is now in line with council requirements.

The winter weather threw up some challenges, however they were overcome through the resilient site team.

The increased height of the bridge has led to some farm race realignments which had the subsequent benefit of improved machinery access over the river.

Another good solution provided to our satisfied client.

 

 


Bridge It NZ Manager, Kim Bevans
with happy client Ian Haigh

Let us manage the details:


Site investigation
and assessment

Full design, drawings,
fabrication and installation

Resource and
building consents

Compliance
Certification

Funding application
assistance

Traffic management
plans