><
New bridge replaces old culvert
Our client required access for a maturing forestry block near Gisborne. With the existing culvert unable to support the heavy forestry equipment, a new HNHO-72 bridge is being installed. With a tight timeline to ensure access is enabled for continued harvesting operations, the new bridge means our client can stay on schedule. We are proud to have provided an effective and high quality solution to meet their needs.
The site crew involving Liam Bellman and Waka Wickcliffe are completing the works with the bridge due for completion by the end of August.
Let us manage the details:
Site investigation and assessment |
Full design, drawings, fabrication and installation |
Resource and building consents |
Compliance Certification |
Funding application assistance |
Traffic management plans |