Out with old and in with the new for South Taranaki farm


This Hawera farm needed a replacement for their existing steel beam (railway irons), and timber deck bridge that provides farm access over the Mangatoki Stream.

Bridge It NZ provided a complete solution for them by firstly removing their old bridge, then placing new abutments in behind the old, which tied into the existing walls to maintain its stability. We then installed a new 11m Double T all concrete, heavy duty, single span bridge - capable of taking fully loaded truck and trailer units.

Let us manage the details:


Site investigation
and assessment

Full design, drawings,
fabrication and installation

Resource and
building consents

Compliance
Certification

Funding application
assistance

Traffic management
plans