Finding the Right Solution for a Railway Crossing Bridge


Maraetaha Railway Crossing Bridge

Hikurangi Forest Farms, now Aratu Forests Ltd, needed an answer to a tricky bridge project and Bridge It NZ, working in close collaboration with them, provided the ideal solution.

The project was a railway crossing bridge to enable safe access to forestry land at Maraetaha, 30 minutes south of Gisborne. The challenges – the bridge needed to be high enough to meet Kiwirail’s special height safety requirements and be designed specifically for the load requirements of their heavy forestry vehicles and equipment.

Bridge It NZ met the challenge with the a 21m Steel Beam / Concrete Deck bridging solution to meet their specific criteria. The bridge has a design loading of HN HO 72, in compliance with the NZTA Bridge Manual.

 

And from this happy client….

"Just a quick note of thanks for your help with our Maraetaha rail bridge project. Thanks to the efforts of people like you who have supported us through this project we have been able to provide safe access to the forest for the dozens of people who’s workplace it will be over the coming years.

Andy Costello, Harvesting Manager
Aratu Forests Ltd, Gisborne

 

Let us manage the details:


Site investigation
and assessment

Full design, drawings,
fabrication and installation

Resource and
building consents

Compliance
Certification

Funding application
assistance

Traffic management
plans