New CFT cycleway bridge for Waihi


Our intrepid Engineer, Craig Langsford doing a site survey for a new Composite Fibre (CFT) cycleway bridge for the Western BOP District Council at Waihi Beach. CFT is the ideal solution for this project, being high strength, lightweight and long lasting, with an expected design life of 100 years!

Let us manage the details:


Site investigation
and assessment

Full design, drawings,
fabrication and installation

Resource and
building consents

Compliance
Certification

Funding application
assistance

Traffic management
plans