Washed out bridges can play havoc with people’s lives and create costly problems far beyond the expense of a replacement bridge. Our Rapid Response Bridges, designed in partnership with DC Structures Studio are specifically created to restore long-term access after a severe weather event. They are lightweight and cost-effective but offer a permanent solution for homeowners, farmers, and councils who are struggling to get back on their feet and clean-up flood-damaged property. Designed to meet NZTA Bridge Manual standards, they are made from durable galvanised steel and sustainable timber, offering an environmentally-friendly solution that is suitable for a wide range of scenarios. Balustrades are 1.2m tall and feature three rails but can be in-filled with an anti-climb mesh if required.
Our kitset bridges offer an affordable and convenient alternative to a full turnkey bridge package which can be easily installed with minimal tools and machinery.
Available in spans of 13.4m, 12m, 10.8m, 9m and 7m (smaller spans also possible).
Once officially engaged, we’ll begin fabrication immediately. Your bridge can be ready for pick up / delivery in as little as two weeks.
Not sure if this bridge meets your specific needs?
Chat with our Sales Manager, Dan Batey. With his extensive knowledge and experience, Dan will help you navigate the options, ensuring you choose a bridge that’s not only cost-effective but fully compliant and tailored to your project.