CFT is the ideal solution for this project, being high strength, lightweight and long lasting, with an expected design life of 100 years!
Our intrepid Engineer, Craig Langsford doing a site survey for a new Composite Fibre (CFT) cycleway bridge for the Western BOP District Council at Waihi Beach. CFT is the ideal solution for this project, being high strength, lightweight and long lasting, with an expected design life of 100 years!