Other

Finding the Right Solution for a Railway Crossing Bridge

Hikurangi Forest Farms, now Aratu Forests Ltd, needed an answer to a tricky bridge project and Bridge It NZ, working in close collaboration with them, provided the ideal solution.

Location

Maraetaha

Client Name

Aratu Forests Ltd

Date

Our project

We are proud of our work and would like to share our project

Maraetaha Railway Crossing Bridge

Hikurangi Forest Farms, now Aratu Forests Ltd, needed an answer to a tricky bridge project and Bridge It NZ, working in close collaboration with them, provided the ideal solution.

The project was a railway crossing bridge to enable safe access to forestry land at Maraetaha, 30 minutes south of Gisborne. The challenges – the bridge needed to be high enough to meet Kiwirail’s special height safety requirements and be designed specifically for the load requirements of their heavy forestry vehicles and equipment.

Bridge It NZ met the challenge with the a 21m Steel Beam / Concrete Deck bridging solution to meet their specific criteria. The bridge has a design loading of HN HO 72, in compliance with the NZTA Bridge Manual.

And from this happy client….

"Just a quick note of thanks for your help with our Maraetaha rail bridge project. Thanks to the efforts of people like you who have supported us through this project we have been able to provide safe access to the forest for the dozens of people who’s workplace it will be over the coming years.”

Andy Costello, Harvesting Manager
Aratu Forests Ltd, Gisborne

Quote

Need to know more about building a bridge?